The On The Go Messenger Bag
Product #: 551236546
This designer messenger bag features heavy duty hardware and an adjustable shoulder strap. Strong 420D polyester twill for outer and 210D polyester for liner. Zippers and lining provide a bright splash of color for a dramatThis designer messenger bag features heavy duty hardware and an adjustable shoulder strap. Strong 420D polyester twill for outer and 210D polyester for liner. Zippers, zipper pulls, and lining provide a bright splash of color against the classic black of the bag for a dramatic look.ic look. Fits 15" laptop.
Pricing
Description: 1 Color 1 Location
Quantity:
25
50
100
250
Price:
$22.39
$20.49
$19.09
$17.99
Description: 4 Color Process
Quantity:
25
50
100
250
Price:
$23.89
$21.99
$20.59
$19.49
Description: UNIMPRINTED
Quantity:
25
50
100
250
Price:
$17.99
$17.99
$17.99
$17.99
Description: Embroidery, up to 8000 Stitches
Quantity:
25
50
100
250
Price:
$24.39
$22.49
$21.09
$19.99
Pricing is subject to change. Prices may vary depending on colors, sizes, locations, and thread count.
Prices shown are based on 1 color 1 location screen printing.
For any additional colors, locations, and other imprint methods, please call us at 1-800-656-2460 (Toll free) or email us at support@nanddsports.com
Prices shown are based on 1 color 1 location screen printing.
For any additional colors, locations, and other imprint methods, please call us at 1-800-656-2460 (Toll free) or email us at support@nanddsports.com
Details
Colors:
Black / Blue
Sizes:
16 " x 15.5 " x 4.5 "
Materials:
N/A
Production
Production time
5-7 business days (5-7 business days (5-7 business day(s) for 1 Color 1 Location, UNIMPRINTED.))
5-7 business days (5-7 business days (5-7 business day(s) for 1 Color 1 Location, UNIMPRINTED.))
7-10 business days (7-10 business days (7-10 business day(s) for 4 Color Process, Embroidery, up to 8000 Stitches. Production time begins after proof approval.))
7-10 business days (7-10 business days (7-10 business day(s) for 4 Color Process, Embroidery, up to 8000 Stitches. Production time begins after proof approval.))
Rush time
999 business days
999 business days